Análise das causas de aditivos de custo e de prazo em obras públicas de instituições federais de ensino

Completing works within the cost and schedule stipulated in the planning phase is a major problem faced by managers in the construction industry. With this, several studies have been carried out around the world to identify the main reasons that lead to noncompliance with the works at the time and c...

ver descrição completa

Autor principal: ALVARENGA, Felipe Campos
Grau: Dissertação
Idioma: por
Publicado em: Universidade Federal do Pará 2019
Assuntos:
Acesso em linha: http://repositorio.ufpa.br/jspui/handle/2011/11129
Resumo:
Completing works within the cost and schedule stipulated in the planning phase is a major problem faced by managers in the construction industry. With this, several studies have been carried out around the world to identify the main reasons that lead to noncompliance with the works at the time and cost initially established. The present study aims to analyze the contractual additions made in public works of the Federal Institutions of Education (IFEs) and the main reasons that led to their conclusion. To achieve this goal, statistical tools were used to compare the cost and time changes between the country regions. The data of this work includes public construction projects divided in all the 5 regions of the Country, filtered from the database of the Ministry of Education. A diagnosis was made showing the percentage of additives among the regions and the main justifications of the same ones indicated in a sampling in this database. Statistical techniques such as the Kruskall-Wallis Analysis of Variance and the Mann-Whitney U-Test were used for data analysis and inference. As results, the differences in the distribution of time and cost additives were statistically significant among the regions, with the South and Central-West regions presenting the greatest differences and the North, Northeast and Southeast regions with a statistically similar behavior among them. Of the 2178 projects collected, 69.05% had additives of term and 61.89% of cost. The main factors that affect time and cost of the projects were the inclusions and / or modifications of design and the additions of services. The ways to reduce the incidence of overruns point to the use of Building Information Modeling (BIM) technology, lean construction and greater experience in the management of works.